Power Outage Restoration Company: What the Right Partner Looks Like

Back
By admin
Apr 01, 2026
Read Time

A power outage restoration company is responsible for one fundamental objective above all others: returning service to customers safely and as quickly as possible after a weather event, equipment failure, or system disturbance. That sounds straightforward. In practice, it demands a specific combination of crew capacity, field logistics, damage assessment capability, sustained operational management, regulatory compliance, and incident command coordination that most contractors don't maintain. OneSource Restoration does — and this guide will help utilities understand the difference between a true power outage restoration company and contractors who merely offer restoration services as a secondary capability.

The operational complexity of large-scale outage restoration is often underestimated. When thousands of customers lose power simultaneously, restoration isn't simply a matter of dispatching crews to fix things — it's a coordinated, prioritized sequence of operations where decisions about which repairs to address first directly determine how many customer-hours of outage occur. A power outage restoration company that prioritizes transmission mainline restoration before distribution branches saves thousands of customer-hours of outage compared to a contractor that addresses repairs in geographic sequence or contractor convenience order. The difference between a company optimized for outage restoration and a general construction contractor shows in damage assessment rigor, restoration prioritization discipline, crew coordination sophistication, basecamp independence, and the ability to sustain operations at intensity and scale for weeks when required.

---

What Does a Power Outage Restoration Company Need to Provide?

The restoration cycle that follows a major weather event has several distinct and critical phases. A capable power outage restoration company needs to function across all of them, not just the final restoration phase.

Damage assessment and system mapping. The restoration cycle begins with damage mapping — not with line trucks. Assessment crews move through the distribution and transmission system before restoration begins, identifying failures, prioritizing by customer impact, and building the information base that makes restoration efficient. Skipping or compressing this phase extends total restoration time by 20-40%. Early assessment enables restoration managers to direct crews toward the highest-impact repairs first — restoring transmission corridors that serve hundreds of thousands of customers before addressing service lines affecting dozens of customers. A power outage restoration company with dedicated damage assessment capability deploys assessment crews independently, allowing restoration to begin in one area while assessment continues in others. Assessment data should include location (GPS coordinates or pole number), damage type (downed line, pole failure, transformer damage, equipment outage), severity classification (complete failure requiring full replacement, partial damage requiring repair, equipment-only outage), and estimated customer impact (number of customers affected, criticality of interrupted load). Assessment teams should follow structured routes rather than random coverage, ensuring systematic coverage of the entire affected area. Assessment data should be provided to the utility in real-time format (typically every 2-4 hours) so that restoration crews can be assigned based on actual damage rather than estimates.

Crew deployment at operational scale with coordination. Distribution restoration requires people — enough of them, in the right places, working safely and efficiently. For a major storm affecting a large utility service territory, that means large crew counts — sometimes 100+ crews — deployed across a coordinated operational structure, not individual crews working independently without coordination. A power outage restoration company maintains incident command structures that organize crews geographically (North Zone, South Zone) or by damage type (Mainline Restoration, Service Restoration, Underground Restoration) with clear chain of command, regular communication, and safety oversight at every level. Crews should be organized into strike teams (typically 4-6 workers per team with a crew leader) with crew leaders reporting to area supervisors who report to operations managers who report to the incident commander. This hierarchy enables coordination across many crews while maintaining field-level supervision. Geographic organization works well when damage is distributed across an area; damage-type organization works well when damage is concentrated in specific system segments.

Equipment and materials supply chain management. Poles, wire, transformers, hardware, connectors, and other materials flow to work sites continuously during a major restoration. A supply chain breakdown causes restoration delays as crews wait for materials. A power outage restoration company maintains material supply chains that push stock to forward staging areas before demand peaks, pull material from warehouses to work sites on request, and track inventory to ensure critical items are available. This includes pre-positioning material in anticipation of specific storm paths (material positioned ahead of the storm path can be deployed immediately; material positioned after the storm passes must be mobilized, creating delays), maintaining supply relationships with material wholesalers that can deliver additional stock on short notice, and logistics systems that track which materials are at which locations and which work sites need what materials next. Material supply challenges are often underestimated but critically important — a crew waiting for poles or wire is a crew not working, extending restoration timelines. Supply chain management includes not just poles and wire, but transformers, hardware, connectors, and other specialty items needed for specific work types.

Basecamp operations that function independently. In major events, the affected area can be large enough that standard lodging and food service options are damaged or overwhelmed. Self-sustaining basecamp operations — housing, meals, equipment maintenance, fuel — let crews stay in the area and work effectively without the daily logistics burden of operating from outside the affected area. A power outage restoration company with true basecamp capability maintains worker housing capacity (trailers rated for 4-6 workers each; a 200-worker basecamp requires 40+ trailers), food service capacity (kitchen facilities producing 3 hot meals daily for 200+ workers), equipment maintenance bays (for bucket trucks, digger derricks, and other equipment), fuel depots (diesel fuel for equipment, gasoline for vehicles), and laundry and sanitation services. Basecamp operations also include transportation from housing to work sites (buses or crews transport), reducing crew fatigue and enabling longer effective work days. A contractor that relies on the utility to provide housing, food service, and transportation becomes dependent on the utility for logistics that the utility itself may be struggling to manage in the aftermath of a major event.

Safety in non-standard conditions with field-proven systems. Post-storm field work is among the most hazardous utility operations. Compromised structures, flooding, debris, downed lines, and operational pressure combine to create elevated risk. Safety management during restoration has to function at pace — daily briefings, field supervision, hazard protocols — not relax when work intensity increases. A power outage restoration company operates formal daily safety briefings at basecamp or field locations (addressing that day's specific weather conditions and work site hazards), maintains field supervisors who observe crew work and identify hazards in real time (standing at work sites, not managing from an office), enforces hours-of-service limits to prevent fatigue-related incidents (crews working 16 hours daily for weeks develop hazardous fatigue), and investigates all incidents promptly (understanding root causes and preventing recurrence). Safety should be codified in operational procedures, not left to individual crew judgment. OSHA 1910.269 compliance isn't optional; it's a foundational requirement for line crew work.

Documentation and regulatory reporting. Utilities are under regulatory scrutiny during and after major outage events. Restoration progress tracking, crew deployment records, incident documentation, and event summaries all support the utility's compliance reporting to state public utility commissions, NERC standards, and FEMA if federal disaster declarations apply. A power outage restoration company maintains systems that track daily crew counts deployed (documenting which crews are deployed where), restoration progress by geographic area (tracking which system segments are restored), incidents with severity classification (documenting safety incidents), equipment utilization (tracking how many bucket trucks, digger derricks are deployed daily), and supply status (identifying material shortages or excess). This information should be provided to the utility's emergency operations center regularly (often every 4-8 hours during active response) in standardized format that feeds the utility's regulatory reporting and customer communication. Documentation should be detailed and specific, not vague progress reports that obscure operational reality.

---

How Does Regional Presence Affect Power Outage Restoration?

Geography matters more in outage restoration than in almost any other utility service category. The impact is dramatic and measurable.

A power outage restoration company with crews staged in the Southeast responds to a Gulf Coast hurricane in hours. One mobilizing from the mid-Atlantic responds in 36-48 hours. One mobilizing from the Midwest responds in 48-72 hours. For utilities operating under regulatory restoration timelines, that gap translates directly into compliance risk and customer impact. A 48-hour mobilization delay means 48 additional hours of customer outages before restoration even begins — thousands of customer-hours of outage that might have been avoided with a regional contractor. For utilities measured on SAIDI (System Average Interruption Duration Index) or CAIDI (Customer Average Interruption Duration Index) metrics, the contractor's location matters as much as the contractor's crew count.

Regional experience also matters significantly. Line crews familiar with Southeast utility systems — the tree species (pine, sweetgum, oak) that cause problems, the soil conditions that affect pole stability, the operational practices of regional utilities, the topography and weather patterns that affect work site conditions — work more efficiently than crews importing unfamiliar assumptions into a new environment. A crew familiar with how Florida utility systems handle wet post-storm conditions (flooding, waterlogged soil, saturated vegetation) works more efficiently than a crew experienced only with dry western terrain. Regional crews understand local utility communication protocols, operational standards, and regulatory requirements that vary by state. A crew familiar with Florida's rural electric cooperative operational practices understands different communication channels and approval processes than a crew experienced only with investor-owned utilities.

OneSource Restoration maintains operational presence across the Southeast and Gulf Coast year-round. Storm season readiness isn't built from scratch each year — it's maintained continuously. Crews operate in the region during off-season, supporting routine maintenance and construction work. Equipment is stored regionally and maintained on ongoing basis. Basecamp facilities are identified and maintained in readiness. Crews familiar with local utility systems and regional conditions are already in place. Contact OneSource Restoration at onesourcerestoration.com to discuss regional storm response coverage for your service territory and to understand how OSR's geographic presence translates into faster response.

---

What Pre-Event Planning Should a Power Outage Restoration Company Support?

Effective outage restoration starts before the storm. A capable power outage restoration company should support structured pre-event planning that establishes expectations and removes friction when response is activated:

Pre-event service agreements that lock in crew availability and rates. Crew availability, rates, and mobilization protocols should be established before the season — not negotiated after a storm is confirmed. A pre-event agreement specifies crew count commitments for different storm categories (tropical storm affecting 5% of service territory, Category 1 affecting 20%, Category 3 affecting 50%), pre-negotiated labor rates (journeyman, apprentice, equipment operator), equipment rates (bucket truck per day, digger derrick per day), basecamp costs per person per day, and damage assessment pricing. With rates locked, both the utility and contractor can make decisions during response without uncertainty about costs. Agreements should include escalation provisions for events exceeding initial forecast (if a Category 2 hurricane becomes a Category 3, how does crew deployment scale? how do rates apply?).

Storm tier planning for different event scales. Different event scales require different responses. A tropical storm affecting 5% of a utility's service territory requires different crew deployment than a Category 3 hurricane affecting 50% of territory. Pre-event planning should define the crew count and operational scope for different storm categories, enabling rapid activation decisions when an event approaches. Planning should address mobilization timelines (How many hours after hurricane watch to crews deploy?), initial assessment scope (Which areas are assessed first? transmission before distribution? major load centers first?), and crew prioritization (Which areas get crews first? highest-impact repairs first, or geographic dispersion?). Storm tier planning ensures that when a specific storm intensity is forecast, both the utility and contractor know what response is activated without requiring real-time negotiation.

Communication protocols and data requirements. Before an event occurs, the utility and contractor should establish how information flows during active operations. What information does the contractor provide to the utility's emergency operations center? At what frequency (every 2 hours, every 4 hours)? In what format (email, phone call, web portal)? Typical information includes crew counts by geographic area (how many crews in North Zone, South Zone, etc.), miles of mainline restored per day (tracking restoration progress), service restoration progress (tracking when individual customers are restored), incidents with severity classification (documenting safety incidents), equipment availability (tracking if any equipment is out of service), and material supply status (identifying if any materials are in short supply). Established protocols prevent miscommunication and enable the utility's leadership to make informed decisions about restoration strategy. Communication protocols should be tested before season — utilities and contractors should conduct communication drills to ensure that systems work as planned.

Equipment pre-positioning and staging area identification. Getting the right equipment staged in the region before storm season reduces response time significantly. A contractor with bucket trucks, digger derricks, and material-handling equipment pre-positioned in the Southeast can begin restoration work immediately. A contractor that has to mobilize equipment from out of state loses 48 hours before equipment arrives. Pre-event planning should identify specific staging areas where equipment is positioned (providing addresses for verification), basecamp locations where workers are housed (providing facility details), and material warehouses where stock is maintained (providing inventory information). These locations should be identified, inspected, and contracted before storm season begins. Contracts should specify whether the utility owns facilities, the contractor owns facilities, or facilities are leased for the season.

---

How Storm Restoration Response Works: Step-by-Step

Understanding the operational sequence of a major power outage restoration helps utilities evaluate company readiness and set expectations:

Step 1: Pre-Event Activation and Crew Staging (T-48 to T-0 hours before the storm impacts). As weather forecasting confirms that a significant storm will impact the utility's service territory, the pre-event agreement is activated. The contractor begins moving crews from their normal locations into pre-identified staging areas in or near the affected service territory. Equipment inventories are confirmed and positioned (verifying that staged equipment is ready and serviceable). Basecamp facilities are activated or made ready for rapid activation (confirming that housing, food service, equipment maintenance are ready). Fuel depots are tested and opened (ensuring fuel is available). The contractor confirms with the utility that crew movements are on schedule and that basecamp readiness is confirmed for the deployment level required. This pre-event activation typically occurs 24-48 hours before the storm makes landfall.

Step 2: System Assessment Begins Immediately After Storm Passage (T+1 to T+4 hours). As the storm passes through the utility's service territory, damage assessment crews begin systematic surveys. Assessment teams follow pre-mapped patrol routes (pre-planned routes covering the entire service territory), identifying downed lines, pole failures, equipment outages, and service interruptions. Teams document location (GPS coordinates or specific pole numbers), damage severity (complete failure requiring full replacement, partial damage requiring repair, equipment-only outage), and customer impact estimates (number of customers affected, criticality of interrupted load). Assessment information is transmitted to the utility's emergency operations center (typically every 2-4 hours) where it's used to prioritize restoration efforts. Some contractors employ aerial patrol (helicopter or drone) to provide rapid overview assessment (scanning large geographic areas from the air to identify major damage patterns) before ground assessment crews conduct detailed work (physically inspecting and documenting each damaged structure).

Step 3: Restoration Crew Deployment Based on Prioritization (T+4 to T+8 hours). Based on damage assessment and utility prioritization, restoration line crews are assigned to geographic areas or damage types. Crews organize into strike teams focused on high-priority repairs — transmission restoration (affects largest customer count), mainline distribution restoration (affects large geographic areas), then service restoration (affects individual customers or small groups). The contractor's incident commander establishes operational structure with area supervisors, crew leaders, and individual crews organized by geography or work type. Regular communication between contractor and utility begins — typically every 4 hours or as needed, providing updates on crew deployment, work progress, and any issues requiring utility attention.

Step 4: Basecamp Operations and Sustained Logistics (T+6 to T+12 hours and ongoing). Basecamp operations escalate to full capacity. Worker housing is activated and staffed (trailers are occupied, bedding is provided, sanitation facilities operate). Dining facilities begin serving meals (three hot meals daily for all deployed workers). Equipment maintenance facilities are operating 24/7 (bucket trucks and digger derricks are maintained and repaired continuously). Fuel depots begin dispensing (fuel is available for equipment and vehicles). Laundry and sanitation services operate continuously (workers' clothes are washed, showers are available). A basecamp operations manager tracks worker counts (how many workers are deployed, how many are at basecamp, how many need rest/rotation), manages supply chains (meals, fuel, equipment parts), coordinates transportation (buses or vehicle pools move workers from basecamp to work sites and back), and monitors service adequacy (are workers getting adequate food, rest, hygiene facilities?). Basecamp operations are often the least-glamorous but most-critical function enabling sustained response.

Step 5: Daily Safety Briefings and Field Oversight (T+12 hours and continuing daily). Every morning before crews deploy, formal safety briefings occur. Weather conditions for the day are reviewed (precipitation, wind speeds, temperatures expected at work sites). Specific hazards at that day's work locations are discussed (flooding, unstable structures, downed power lines, other site-specific hazards). Near-miss reports from the previous day are analyzed (what happened, why it happened, what can be done differently today?). Safety expectations are clearly communicated. Field supervisors maintain direct oversight of crews at work sites, performing real-time hazard assessment (identifying new hazards as conditions change) and enforcing safety protocols even under operational pressure. Safety field oversight is critical — safety protocols that exist only on paper don't prevent incidents; safety that is actively enforced in the field reduces incidents significantly.

Step 6: Restoration Work Across Multiple Fronts (T+24 hours and continuing). Restoration work proceeds across restoration priority sequence — transmission first (affects largest customer count), then mainline distribution (affects large geographic areas), then service restoration (affects individual customers). Strike teams work designated areas with clear completion metrics (specific geographic areas or damage types assigned to each team). Progress is tracked daily (recording which customers have been restored, which work areas are complete). Crew rotation protocols prevent fatigue (crews work sustained shifts, then stand down for rest, with replacement crews rotating in). Material supply is managed to prevent work stoppages (ensuring poles, wire, transformers are available at work sites). Equipment maintenance is ongoing (keeping bucket trucks and digger derricks operational despite intensive use).

Step 7: Progress Tracking and Regulatory Updates (Every 4-8 hours throughout response). The contractor provides regular updates to the utility's emergency operations center — crew counts by area (how many crews deployed in each geographic zone), miles of mainline restored per day (tracking restoration progress), service restoration progress (tracking when individual customers are restored), incidents (safety incidents are documented), equipment status (any equipment out of service?), supply status (any material shortages?). Information feeds utility regulatory reporting (to state public utility commissions, NERC standards compliance), customer communication (estimated restoration times for specific areas), and post-event analysis (documenting what worked, what needs improvement).

---

What Distinguishes OSR as a Power Outage Restoration Company?

OneSource Restoration's structure is designed specifically around large-scale power outage restoration. Not as an extension of a construction program — as the primary mission.

OSR provides damage assessment crews that deploy independently of restoration crews (assessment continues while restoration begins in other areas), distribution line restoration teams organized at operational scale with clear incident command (crews organized geographically or by work type, with defined reporting structure), transmission restoration specialists for high-voltage work, vegetation management support for vegetation-related outages (addressing tree-related damage), and full basecamp operations including housing, meals, equipment maintenance, and fuel management. The basecamp capability — housing, food service, fuel, equipment maintenance — is an established operational function, not an improvised response to a situation. OSR has contracted relationships with food service providers (meal service contracts are already in place), logistics partners (for material movement), and facility operators (for basecamp activation) who can activate basecamp operations quickly.

OSR operates within the ATK Energy Group structure, which means access to additional crew capacity through NOMAD Power Group for additional Gulf Coast distribution crew capacity, Victory Powerline Services for field quality assurance on large-scale deployments, and ATK Logistics for supplemental equipment, materials, and transportation. This integration enables OSR to scale beyond in-house resources for very large events affecting multiple utilities while maintaining unified command structure (all crews operate under OSR incident command) and consistent safety standards (all crews follow OSR safety protocols regardless of source).

OSR maintains operational presence in the Southeast and Gulf Coast with crew staging locations in Florida, Georgia, Alabama, Mississippi, Louisiana, and Texas. Crews operate in-region year-round, which means they're familiar with local utility systems, local regulatory requirements, and regional operational practices. Equipment is maintained regionally. Basecamp facilities are identified and maintained in readiness. Contact OSR at onesourcerestoration.com to discuss how pre-event planning with OSR enables faster, more efficient restoration for your utility.

---

Advanced Pre-Event Planning Topics

Effective pre-event planning removes friction and enables rapid response when storms form. Here's what capable power outage restoration companies should support:

Scenario planning for different event sizes. What crew deployment is needed for a Tropical Storm? A Category 1 hurricane? A Category 3? A major hurricane? For each scenario, the plan should specify crew count, basecamp capacity required, material staging needed, and mobilization timeline. Scenario planning enables rapid activation decisions — when a Category 2 hurricane is 48 hours from landfall, the utility knows immediately what crew deployment to request from the contractor, and the contractor knows the scale they're preparing for. Scenario plans should be specific, not general — "tropical storm scenario assumes 15-20 crews deployed for 5 days" is more useful than "we'll scale crew deployment based on need."

Basecamp and staging area identification and preparation. Before season, specific basecamp locations should be identified, inspected, and contracted. How many workers can each location accommodate (trailer capacity, dining capacity, equipment maintenance bay capacity)? What facilities exist (housing, food service, equipment maintenance)? What needs to be constructed or rented? Contracts should be in place before season to ensure facility availability when response activates. Site surveys should document whether facilities meet requirements, what upgrades may be needed, and what lead time is required to activate each facility.

Communication protocol testing. Before season, the utility and contractor should conduct a communication protocol test. Practice the emergency operations center activation (practice how the utility's EOC operates during emergency response). Practice the contractor-utility incident commander communication structure (practice the communication chain). Test data formats and reporting frequency (practice how information flows). A drill before the season catches communication gaps while there's time to fix them. Drills should involve the actual people who will handle communication during an event, not just a theoretical exercise.

Material positioning and inventory planning. Specific material (poles, wire, transformers) should be positioned in forward staging areas before storm season. Inventory levels should be planned based on anticipated damage scenarios (a Category 3 hurricane affecting a utility's service territory will require X poles, Y miles of wire, Z transformers — pre-position inventory based on these scenarios). Supply contracts should be in place to enable rapid restocking during the response (if pre-positioned inventory is depleted, material wholesalers can deliver additional stock within X hours).

---


Related topics: emergency power restoration service, electrical repair commercial, emergency electrician near me, utilities solutions, northwest lineman college, hurricane line crew contractor, utility storm response contractor, gridtek utility services comparison, storm restoration contractor, transmission tower, power construction, utility solutions comprehensive storm restoration, electrical services near me, storm response guide electric utilities.

banner
Optimize Your Operations with Custom Inventory Management Software Solutions

Experience seamless control, accurate tracking, and smarter decision-making. Elevate your business with our advanced software solutions

Frequently Asked Questions

A power outage restoration company provides the crews, equipment, operational infrastructure, and integrated logistics that utilities need to restore power after a major weather event — including damage assessment, line restoration crews, basecamp operations, supply chain management, and regulatory documentation support.
Damage assessment before restoration deployment enables utilities to prioritize the highest-impact repairs first — restoring transmission corridors before distribution branches. Crews deployed without accurate damage mapping often work less efficiently — addressing lower-priority repairs before critical failures are identified. Early assessment can reduce total restoration time by 20-40%.
Yes. OSR's basecamp operations cover worker housing, food service with contracted meal providers, equipment maintenance facilities, fuel management, laundry, transportation, and sanitation services — self-sustaining and designed for areas where commercial infrastructure is unavailable or damaged. OSR can activate basecamp within 12-24 hours of authorization.
Standard line contractors may assist with restoration and have qualified crews. Power outage restoration companies maintain the complete infrastructure — pre-staged crews, damage assessment capability, basecamp logistics, supply chain management, incident command structure, and documented operational protocols — built specifically for large-scale emergency response.
OSR offers pre-event service agreements that establish crew availability at different storm tiers, pre-negotiated labor and equipment rates, mobilization protocols from storm watch to field deployment, damage assessment procedures, basecamp activation scope, and communication protocols with the utility's emergency operations center. Contact OSR at onesourcerestoration.com to discuss agreement structure tailored to your service territory and storm exposure.
OSR's primary coverage area includes Texas, Louisiana, Mississippi, Alabama, Georgia, and Florida, with the ability to extend to adjacent Southeast states for very large events affecting multiple utilities. OSR maintains year-round presence in these states with crews, equipment, and basecamp facilities ready for activation.
Yes. Through coordination with ATK Energy Group subsidiaries including NOMAD Power Group, Victory Powerline Services, and ATK Logistics, OSR can scale crew deployment, equipment capacity, and management depth for major multi-utility events. This scaling enables OSR to handle events that would exceed in-house capacity while maintaining unified command structure.
OSR's year-round presence in the Southeast and Gulf Coast enables rapid crew mobilization — crews deploy within hours of activation, not 48+ hours for out-of-state mobilization. Regional crews are also familiar with local utility systems, local regulations, and regional operational practices, enabling faster and more efficient restoration work.
OSR provides crew deployment records, restoration progress documentation by geographic area and damage type, incident reports with severity classification, equipment utilization records, safety performance metrics, and event summaries that support utility regulatory filing with state public utility commissions, NERC standards compliance, and FEMA public assistance applications if applicable.
Yes. OSR provides both distribution and transmission restoration capability. Transmission restoration specialists are available for high-voltage work on transmission systems. Specify in your pre-event agreement what transmission restoration scope is needed.
OSR can activate basecamp operations within 12-24 hours of deployment authorization, assuming pre-event agreements identify specific basecamp locations. Full capacity (housing, food service, equipment maintenance, fuel) is typically reached within 48-72 hours.
OSR crews include journeyman lineworkers (60-70%), apprentices (30-40%), equipment operators (bucket truck and digger derrick specialists), crew leaders, and area supervisors. Crew composition is tailored to work scope — distribution mainline crews, service restoration crews, and transmission specialist crews each have appropriate composition.
OSR maintains material staging areas with pre-positioned inventory and supply contracts with material wholesalers. During active response, material is pushed to forward staging areas and pulled to work sites on demand. Inventory is tracked to ensure critical materials are available and backorders are identified and managed. --- When the grid goes down across thousands of customers, the power outage restoration company you've pre-selected either has the crews, the logistics, the operational structure, and the regulatory compliance systems — or it doesn't. OneSource Restoration maintains that comprehensive capability. The difference between a company structured for large-scale response and one that's unprepared shows in restoration timelines, crew efficiency, safety performance, and regulatory compliance. Contact OSR at onesourcerestoration.com to discuss your power outage restoration program and to establish pre-event planning before this storm season. ---